Construction Process of Industrial Hall at Jahansteel Co
“Jahansteel Sepahan” Co. has a 60-year history in the field of steel and steel structures. Based on this history, the company has also achieved bolted steel structures technology. Before starting the construction of an industrial hall, the client proposes its own desired plans. Then, the proposed plans are examined by the technical department, and the details of the project are listed separately.
Otherwise, the engineers of the design department of the company, visit the place of the project and design a plan based on the needs of the client, which can be a factory, warehouse, repair garage, sports hall, parking lot, or even poultry farm.
When it comes to raw materials, the company always underlines the importance of providing quality raw material from reliable companies.
Firstly, the cutting unit cuts the raw materials according to the client’s plans using 3m and 6m guillotines as well as straight and CNC cutting machines. The prepared plates are drilled by a “radial drill”, if required, to be assembled using CO2 welding machine.
After finishing work stage and applying fine details on the plates, welded parts go through cleaning stage, where submerged arc welder and CO2 welding machine are used.
After the completion of milling process in the cleaning stage, the parts are sent to painting.
The last stage of the construction of an industrial hall is applying paint through “airless” paint sprayer. After that, the parts are prepared for being loaded and transported to the project site.